项目

King Abdulaziz Port Mega-Container Hub Transformation

Growth is the current trend in the Kingdom of Saudi Arabia (KSA) and Saudi 港口 Authority have their eyes set on changing the future of logistics with their expansion plans for the King Abdulaziz Port Mega-container hub.

As Engineer Consultants for the Consolidation Works at the First and Second Container Terminals on the King Abdulaziz Port in Dammam, 正规博彩十大网站排名’ 技术 knowledge of container terminal design and our ability to manage multidisciplinary projects from design through construction and commissioning is helping the port move into the future.

Delivering a "no surprises" approach to design, complimented by the ability to value engineer the existing arrangements, our team is working toward a successful outcome for our client Saudi Global 港口. Our in-house specialist project delivery team tapped into 正规博彩十大网站排名’ wider global and local experience to deliver the project with the highest standards of quality.

“We’re honored that Saudi Global 港口 Company turned to us for the first step of their challenging, 雄心勃勃的努力. Our team's extensive experience in designing and managing the construction of container terminals allowed us to understand and navigate the complexities of the project while maintaining business continuity during expansion. ”

马科斯Apostolides

马科斯Apostolides

正规博彩十大网站排名 Executive Director of Operations, 运输 for the Middle East

Saudi 港口 Authority embarked on a development and modernization program to transform the King Abdulaziz Port into a mega-container hub and increase the Port’s capacity to an estimated annual handling capacity of 7.5 million Twenty-foot Equivalent Units (TEU) when the planned expansion works are fully completed.

As a first step of this 雄心勃勃的努力, 正规博彩十大网站排名 was appointed to deliver the design of:

  • 23个泊位的维修和翻新 & 24 at T1.
  • Quay deck and yard pavement repair and/or reconstruction at T1.
  • T1大楼翻新工程.
  • 泊位号建造. 44项涉及T2码头壁吃水.
  • Infrastructure and pavement at the back yard of berth no. 44 at T2.
  • T2新客运大楼.
  • New storage yard of area on new reclaimed land envisaged for an automated container handling operation at T2.

见见我们团队的一些成员

  • Avni Buyukozer
    Avni Buyukozer,项目 & 设计经理

    Avni led the design of this important port development project which required intricate coordination of teams delivering the marine, 土木及首页设计. While acting as the main point of contact with the client and other stakeholders he earned praise from the port management team.

  • 科林并
    科林并,项目总监

    As the Project Director of this major port development project, Colin was responsible for overseeing the overall management and successful delivery of the project.

  • 洛娜贝克
    洛娜贝克,海洋设计主管

    作为船舶设计团队负责人, Lorna was responsible for leading and overseeing the marine design aspect of the project, 其中包括泊位, quay walls and other marine-related infrastructure.

  • 1x1白色像素
    詹姆斯 Brierly,湿设施设计主管

    詹姆斯, 作为湿设施设计团队负责人, was responsible for leading the design of wet utilities such as potable water, 污水和消防系统, ensuring that they meet the project requirements and regulations.

  • Atul Valunjkar
    Atul Valunjkar,干公用事业主管

    Atul led the Dry Utilities Design and oversaw the design of HV and MV electrical systems, ensuring they align with project requirements and adhere to industry standards.

  • 迈克尔·托雷·
    迈克尔·托雷·,建筑设计主管

    Michael successfully led the design team to deliver the building concept design packages that was tendered as Design & 构建(D&B)工作, meeting the project requirements and exceeding the expectations of the project management team.

  • 1x1白色像素
    David Fanthorpe,路面设计主管

    A highly experienced professional in his field, David led the design of the pavement elements of the project skillfully.